S
#1 SamlexLtd
Hi All, Commissioned a system earlier today Gen2 5kw and a single 9.5 battery, the grid icon on the app is showing as greyed out and solar is showing as import even though the sun was low in the sky, any ideas what I have done wrong? Couldn't get through to commissioning?
Thanks