The battery and inverter were on pause and we had a short power cut.
The inverter shows a message of backup overload fault.
We don't have the ability to go off grid so not sure why this happened.
Just googling what to do as I wanted to charge the batteries during the negative Agile period?
Anyone got any pointers?

