I'd be intrigued to know how successful these solutions are proving to be. I was thinking about it a few months ago but then shelved it because it dawned on me that the marginal costs of over-charging were so much lower than the marginal costs of under-charging.
This was in my specific circumstances, perhaps: overnight I had 5p/kWh and an export rate of 4p/kWh. Therefore overcharging by a kWh would only waste a penny (maybe about 1.2p including system losses?). If the automation under-charged overnight, however, I'd be losing about 13p/kWh.
I concluded it would be better to just set the overnight charge %ge on the high side rather than take the risk.
As of today my rather nice Octopus Go rate has expired and I'm on 7.5p overnight and 40p during the day, still with 4p export, so I'm reconsidering. While the numbers on the overcharge side have increased, that 40p daytime rate means the undercharge risk has increased rather more. However, I'm willing to give it a go if you guys are finding it works successfully. Presumably there is - or it would be easy to add - a bit of margin to habitually overcharge by?
Thanks.