Minimum draw required

3 comments started 2023-03-20 last 2023-03-20
GivEnergy ProductsAC CoupledBattery
S
#1 Smk82

What’s the minimum grid draw required before the battery will kick in? I seem to get the solar covering everything bar 30-50W, the remaining is then supplied from the grid. (Obviously on a day where there is loads of solar if isn’t a problem). Appreciate that’s it’s minuscule but just wondering if there is a minimum kick in value rather than the battery sitting there idle

#2 TheDragon (GivEnergy)

100W to wake up, once "Locked on" around +/- 50W is normal.
New Firmware once released is much faster and can maintain grid neutral pretty well

S
#3 Smk82

TheDragon (GivEnergy)

So does the wake up level change with the new firmware or only the reaction speed/time?