TheDragon (GivEnergy)
No, they are not, as recommended by the Tech Team at GE. Here's what they are saying about "Plant" systems:
"This is due to the very unique way in which inverters are logged into our database, up until very recently with the removal of some back end systems and new backend inverter logic it was not possible, the teams are actively working on improving dual inverter logic this year, this technology is in its infancy still as it is, but the "plant" setup of two systems is still very new. Although it may seem very basic it is far more complex than it may look on the surface in the back end of it all.
We have the new release of our inverters + batteries over the next couple of months along with our EV charger and new app all of which has had significant work from our engineers, I do believe following this more emphasis will be put onto the dual system to bring better integration into our apps and monitoring."
I did send an email to the Tech team yesterday, along with my installer, and whether it's linked or not, after sitting idle for the previous hour, the battery then began to discharge.
I don't think it's too much to expect a setup I paid over £10k for to work as advertised. And even if it's still "in beta", the sense that GE are dragging their feet and prioritising other features, which I consider to be non-critical, is a regrettable.