Dual Parallel Inverter/Battery System Controls

6 comments started 2023-08-15 last 2023-10-04
GivEnergy ProductsBattery
A
#1 alandean

I have the capability for two inverter/battery combinations operating in parallel to maximum storage capacity whilst enabling me to charge/discharge at up to 6.0 kW. However, early control performance was poor and I was informed that a forthcoming upgrade to the control system would address this problems I was experiencing. Whilst this upgrade was available I have had to have the configuration modified to operate with a single inverter operating with the two batteries operating in series. I still have the overall storage capacity but my charge/discharge capability if limited to 3.0 kW. When will this control upgrade be available?

S
#2 Smk82

alandean I think you are referring to the EMS unit. Last I have heard is that it’s due to start beta testing next week

A
#3 alandean

Thanks, I'll keep an eye open for it.

A
#4 alandean

Is there an update on when the EMS upgrade is to be available?

S
#5 Smk82

alandean I saw a post from @TheDragon (GivEnergy) on one of the fbook groups saying they had several doubles and a couple of triples under test. I’ve seen a few comments from @micksmith as well suggesting beta is well underway. No idea on launch however, although there was a post on their website saying there would be an update at solar and storage live…

S
#6 Slartibartfast

Was that at 'Solar & storage' Live - 2024?