DD Sorry, replied to the wrong post. Yes, I agree CT clamp positioning is simplest - I've not got my Zappi yet, but that's how I intend getting it installed.
Good news is that I now have my zappi. Unfortunately, while I asked the installer to split the tails in such a way that there was a suitable cable to put the GE CT clamp, he declined (refused) - claimed he had to do it by the book in order to sign it off, and I could rewire it afterwards however I wanted it. Insisted that the zappi was smart enough to not charge from the battery, so perhaps he simply didn't understand the problem. (Or didn't realise I had a hybrid inverter ..?)
So I'm now in the same position. Haven't yet been able to switch to IOG, so for now, it does have the benefit that, if I'm charging from solar, it will fill any temporary lulls from battery rather than grid. [Zappi does seem slow to stop charging when the sun goes behind a cloud, but I guess that's intentional.]
But once I get onto IOG, I'm going to want to export solar rather than charge the car. And choose a workaround for the extra-slots thing.
I think the HA plugin 'batpred' has got support for IOG extra slots, by querying the Octopus servers. I don't have HA installed, but I hope to be able to extract the relevant code into a standlone script. Or maybe I can use the Zappi API to discover whether the car is charging. (May as well take any extra slots going, rather than trying to game things to avoid them.)