SimonClarke The grid thing is mostly you tube scare stories.
No its not. There are dozens, if not hundreds of new developments on hold because there is no grid capacity. There's water, gas, fibre, sewerage (aye right!) but no power connection possible from National Grid.
One near here (Garendon Estate, 3000+ houses) has been on hold for 5 years while they completed an incinerator. Now that the building regs have changed (heat pumps on new builds started after 2023) its still mainly on hold as 42MW of extra power isn't close to what will be required with heatpumps/EV chargers.
On this estate the substation will have to be completely rebuilt when gas is phased out. As will all the others in the town as there is no possibility of them coping unless people are forced to run heatpumps intermittently, and you're never going to get decent COP figures that way.
People are pretty clueless as to the state of the grid, both local and national. Switch from gas space heating to heatpump and you're at LEAST doubling your electricity consumption - more likely quadrupling it. There isn't the capacity for that at a national or local level. Then add in EVs.
Our ex-neighbour is fairly senior in BG on the renewables side of things (has been for 20 years now) so I picked up a fair amount. From initial proposal to deployment on anything over 100MW is currently 13 YEARS. Reason is that its pretty much impossible to get an interconnector to the grid. That's much the same for any significant generating capacity, regardless of how green it is.
In terms of climate, no doubt at all things have to change.
Policy however is a joke (blame the Tories for that), there isn't taxpayer money to pump in and even if there was, every developed country in the world is rebuilding/expanding their grid so where is Brexit Britain going to get the materials and the skills when we can't even make steel now?