I'm trying to do as much preparation work as possible before an electrician comes to install my givenergy charger.
The charger requires a connection between the charger and the EM115 (which was installed when the Hybrid inverter and battery were commissioned) so that the charger can use any spare solar power.
There is no possibility of me being able to run an ethernet cable out to my garage (all new building work).
Does anyone know of a solution to this ?
Many Thanks in anticipation.