Advice. Please.

6 comments started 2025-10-04 last 2025-10-09
GivEnergy ProductsHybrid
#1 Watcher

I am having my SMETS 1 upgraded to a 2 in November. I have solar and a Gen 1 inverter & 2 5.2 batteries. Is there anything I ought to do in preparation for the upgrade to protect my GE kit or should I trust the installer?
Any help gratefully received.

S
#2 SteveCook

Don't know if you have EPS configured
If they are just changing the meter, I would make sure that you consumer units are correctly labelled as to where any battery, inverter and solar power is connected.
When they come, tell them what you have and I suggest you shut it all down manually. You don't want the man to disconnect the grid side of things and then get a shock from your kit from the consumer side.

T
#3 TX200

Take a photo of the CT clamp, so you know which wire it was on!
And make a note of the arrow on it, so you know which direction it should be facing.
Sometimes they don't get it right when they put things back!

#4 Watcher

Thanks, both! Will do.

S
#5 SteveCook

Good luck with your meter. In the end (after 4 years) I finally got Octo to install a dual band comms hub and extension antenna (not Octo's fault, but Arqiva rubbish RF network in the North)

O
#6 Ortwin

We had our SMETS1 meters replaced a month ago by Octopus and had no problems with the solar and EV charger side of things. I just switched them both off and they changed both meters (gas and electric)
I did specifically ask them if the meters can record export just for my piece of mind. However it took a couple of weeks to get the meters sorted out on our octopus account (2 import and 2 export readings on the app) but give them an email with a picture of what I was seeing and two days later all sorted.