I'm currently having solar and battery installed. the installation is almost complete and will be connected and commissioned in a couple of days. Part of the plan was to have a new EV charger that would take the excess solar and put into the car. Until recently, the go-to choice for this would have been the myenergi Zappi and I was about to commit to that but the GivEnergy announce the EV charger. I think once can assume that integration with the GE inverter and battery would be much slicker with the GE EV charger and reading the specs, that seem to be the case, so I've selected this for the EV charger replacement.
As folk will know, the charger will not be available for a little while and so my installer needs to prep the wires accordingly. Of course the power is already there it's just the comms cables.
The user guide on page 5 states...
A two core shielded communication cable must be wired between the charger and the EM115 meter, in order for the charger to charge the vehicle from excess solar.
Additionally, the charger can be wired directly to the GivEnergy inverter in to the meter communication port so that the charger can be controlled by the inverter (coming soon).
So does that mean two comms cables are needed? One from the charger to the EM115 meter and one from the inverter to the charger or is it just one from either? The manual states "additionally". Does either connection give the same function or does one offer more features over the other?
Can someone confirm please? As you might expect, I'd like the installer to have all the detail to put the cables in the right place now rather than re-route and drill later. I have reached my threshold on wires and holes in the house!
Thanks