A quick google search regarding MCS protection reveals the following ...... Is AI correct?
MCS (Microgeneration Certification Scheme) protects renewable energy system buyers when a manufacturer goes bust primarily through the requirement of mandatory Insurance Backed Guarantees (IBGs) or MCS Approved Financial Protection Products provided by the installer. While a manufacturer’s warranty is lost, MCS ensures the installation itself remains protected for at least six years, allowing for remediation if the system fails due to design or workmanship faults.
It goes on to say:
Manufacturer vs. Installer Insolvency: MCS is designed primarily to cover the installer going bust. If the manufacturer (e.g., the heat pump brand) goes bust but the installer is still trading, the installer is generally responsible for remedying faults under the MCS workmanship guarantee
