Electricity Grid Com Fail notifications started when the system was first switched on ( 18July).
The original configuration was 2 x ( 3kw inverter with 8.2kw batteries).
Faults reported on portal and via installer.
After 4 days of continually charging and discharging to the grid the installtion was switched off.
On 1st Aug the installer reconfigured the system to be 3kw and 2 batteries.
The inverters where swapped over as well to test.
GE said I would need a site visit.
Photos of clamps sent to GE who said they looked ok.
Still got the Electric Meter Com Fail.
The notification is regular 7min cycle.
Ie
Alarm raised - 10.49
Alarm cleared - 10.51
Alarm raised - 10.56
Repeat until switched off.
Any ideas on how to resolve this whilst waiting for GE to confirm site visit.