I currently have a Giveenrgy AC battery and a single solar system. I have a CT clamp on the solar system feed so the givenergy display can show me the solar inverter output. I am about to install a second separate solar system ( so that I can continue to receive the FIT payment on the original one). How do I add a second CT clamp for the second solar system and do I need to configure the system?
P
#1 pearnsh