I have tried to use Battery System Modes to help maximise my export to match Octopus Agile higher rates as well as keeping a decent reserve in case needed for Emergency Power Supply (EPS).
But there seem to be issues -
- scheduled times ignored
- discharge power higher than set (maybe by say 25%)
- reserve power ignored completely (allowing batteries to discharge to 4%)
The app respects settings for:- Home Demand or Full Export
I usually set via the GivEnergy app on phone (android) but also tried internet on laptop.
Normally I fill the batteries from solar only (occasionally have forced fill if risk of power cuts or if export rates go exceptionally high - as they did last autumn sometimes).
My settings:
- Scheduled export- Times (say) 16:00 - 19:00
- Discharge power (say) 1000w
- Reserve power (say) 30%
Inverter: Gen1 hybrid 5kw
Batteries: 3 x 8.2kw
So I normally have to treat it as manual settings and remember to change. Somewhat frustrating! I think this has been an issue for a long time and is not new.
Anyone have any similar experience or suggestions?
