Today at 4pm the price of outgoing energy increased so I wanted to export the max 5kw my system can invert
The problem is that if I choose Export mode it empties the battery at the full 2.6 kw and clips the solar which was at 4kw, which means wasted energy!
I would love a mode that simply maxes out export using the priority:
House demand
Remaining solar to grid
Battery to grid to top up to the 5kw limit
Stops when battery is at a set level to keep enough for overnight use
Can this be done with current configurations? If not could it be implemented? I can do this manually by limiting the battery discharge rate but it’s inaccurate and life’s too short…
Thanks