We had a prolonged power cut yesterday, and I remembered that the Gen 2 has a backup power output which we didn't get connected at commissioning,
My plan is to just wire it into a new 13A RCD/socket and manually run an extension lead from garage to house to power essential stuff when required.
I'm happy doing basic electrics, but is this DIYable on the inverter side or does it need something commissioning?